Improving Royal Oak
2024 project map

2024 Construction Projects Map

Use the map above to see if a project is affecting your street. The city realizes construction will be an inconvenience and all efforts to expedite the work will be utilized to minimize traffic conflicts and access to various properties abutting the project.

Notices of Construction have been mailed to affected residents and copies are available online here.

CAP2407 Crooks Road

This week the contractor will be doing several water main connections to complete the new water main installation. If residents will be affected by a shut off, they will be notified the day beforehand via doorhanger with a time and duration for the shut off.  Saturday the contractor plans to start grading and prepping the Crooks road base.

  • Tuesday: Connection near Hickory and Royal
  • Wednesday: Connection near Lloyd
  • Friday: Connection near Vinsetta

CAP2416/2415 Asphalt Resurfacing

This project will resurface several streets in the residential neighborhoods and the downtown.

CAP2416 Downtown

Paving is now complete on the project streets downtown. Only some minor restoration and punch list work still needs to occur.

CAP2415 Neighborhoods

Phase 2: Irrigation and landscape restoration will continue this week.

Phase 3 & 4: Crews will continue to work on adjusting drainage structures to the final roadway height for the remainder of the week, with final paving tentatively scheduled for Friday and Saturday. Some restoration and sprinkler repair will begin midweek.

Phase 5: The contractor will be continuing concrete replacement work, moving to the west side of the roadway.

CAP2415-2416 Phasing Table

CAP2435 Road Reconstruction

The forecast of inclement weather this week may delay some of the work.

On Albert Avenue, the contractor will continue work on grading and landscape restoration.

On Parkview, the contractor will be finishing site cleanup, removal of debris and continue restoration.

On Samoset, the contractor will be finishing the remaining restoration and grading.

On Vinsetta, the contractor will continue pavement removals this week.    

On Nakota, the contractor will be working on remaining restoration and grading.

On Massoit, the contractor will continue with remaining removals this week on the west section beginning on Wednesday, and finish the work at the intersection of Hampton on the east section, pouring concrete at the end for the week. Landscape grading and restoration to continue.

 *As part of this project the contractor will also be installing traffic calming chicanes on Marais Avenue between Thistle and Lexington as approved by the city commission.

CAP2435 street list

CAP2405 Concrete Street Repairs

This project will replace some of the worst panels on the project streets shown in light blue on the project map linked above.

Phase 1, 2 and 3 streets are now complete.

For Phase 4 streets, the contractor will be working on second halves this week.

For Phase 5 streets, the contractor will be working on removing and pouring the first halves. Cement will be poured this week on Manitou and Windemere, then Marais.

First halves / Second halves - The contractor will work on one side of the street at a time to maintain access for residents during construction.

CAP2405 phasing

CAP2410 Water Main Improvements

Water main installation will continue working east, heading towards Crooks. As the contractor moves east block to block, that block will be temporarily closed to traffic during work hours to allow for equipment and operations, and re-opened at the end of each work day.

CAP2440 Green Infrastructure Improvements

Sheridan Drive - Arden Place - Grandview Road

This project is scheduled to begin midweek, with water main installation on Sheridan. 

CAP2440 Exhibit

CAP2402 Sidewalk Program

The contractor's concrete crew is working on sidewalk removals and pouring concrete in the Phase 6 and 7 areas this week.  Restoration crews are following behind doing backfill, topsoil and seed in the completed Phases.

If you would like to make an appointment to discuss your estimate with the project inspector, please call the Engineering Division to schedule at 248.246.3260

Sidewalk Program phase schedule

Please note that construction schedules are tentative, and may change based on weather delays, subcontractors or substantial field modifications. These updates are based on the information currently available.

You can visit www.romi.gov/currentprojects to view the 2024 project map, find copies of mailed construction notices, and read about the city's various construction projects.